User name: Main Partner Simes Inženjering d.o.o. (Podgorica, Montenegro), Partner Statim d.o.o. (Split, Croatia), Automatika d.o.o. (Živinice, BIH)
Project acronym: SPARK
Full project name: SPARK - Smart Controller for Public Lighting Management
Duration in months: 12
Project start date: 1.6.2026.
Date of completion of the project: 31.5.2027.
href="mailto:[email protected]">[email protected]
https://cbchb.eu/cbc-cro-bih-mne/embrace/
"Description project:"
The project develops, tests and prepares for wider application an advanced smart controller for public lighting and energy systems.
The solution enables automated control of lighting fixtures, remote monitoring, monitoring of energy consumption and optimization of the operating mode via LoRa, ZigBee and Wi-Fi communication.
The controller is integrated with an IoT/energy management platform and can work completely autonomously in offline mode thanks to local memory, real-time clock and astronomical clock. calendar.
"Common challenge"
In the program area, public lighting systems are mostly outdated, energy inefficient and often work manually or through unreliable, fragmented solutions, while local authorities have limited capacities for their modernization and management.
Therefore, the need for smart and scalable solutions that enable automation, real-time consumption monitoring and significant cost reduction is growing. energy.
"Goal and expected changes:"
Develop, validate and prepare for the market an innovative, intelligent and scalable solution for managing public lighting based on the SPARK-03 controller and cloud platform.
The solution will enable cities and utility companies to remotely manage the lighting network, reduce energy consumption and maintenance costs, and increase the reliability and safety of public of space.
"Results and deliveries"
Fully functional and scalable SPARK-03 controller and platform integration package. Simes Inženjering
Report on applicability of automation in complex control systems. Statim
Hardware Integration and Field Testing Report. Automation
"Key Stages"
Phase 1 - Development of new technology, service or product.
Phase 2 - External professional assistance for the purpose of developing joint technology, service and product.
Phase 3 - Acquisition of new equipment for the purpose of joint development of technology, service and product.
Phase 4 - Activities for entering new markets of jointly developed technology, services and products.
"Need for cross-border access"
Challenges of low energy efficiency, outdated public lighting and limited technical capacities are common to Croatia, Montenegro and Bosnia and Herzegovina. Testing of the SPARK-03 solution in three different environments enables adaptation and optimization of the system according to different standards and conditions, thereby increasing its reliability and applicability.
"Project innovation"
Development and validation of own hardware, firmware and communication system based on LoRa, ZigBee and Wi-Fi technologies, followed by field testing, optimization and preparation for entering the international market.
“This publication (website, video) has been produced with the assistance of the European Union. The contents of this publication are the sole responsibility of Automatika d.o.o. and can in no way be taken to reflect the views of the European Union